Buildings

What each building costs in labour, wood, stone and upkeep, its looks, building up, taking down and fences.

Building costs

Building Labour Wood Stone A week
Stall Stall 144 gr 3 0 28.8 gr
Shed Shed 288 gr 4 15 57.6 gr
Lean-to Lean-to 72 gr 1 4 14.4 gr
Workshop Workshop 480 gr 5 40 96 gr
House House 720 gr 7 65 144 gr

What they are for

Building What it gives Size On a small plot
stall a stallkeeper who sells your goods (Stall) yes
shed a lock, for living and for work two looks of about 6 × 7 m and 5 × 8 m those two of the three looks
lean-to craft stations, up to 2, no door and no lock about 5 × 3 m yes
workshop a lock and room for every craft station about 14 × 9 m or 9 × 14 m no
house a home with a lock, beds, a kitchen and craft stations the smallest look about 8 × 15 m no
  • One plot takes one stall at most.

Looks and furniture

Building Looks Furniture limit
Stall Stall with a sheet, Trestle table, Tented booth, Curtained stall 12
Shed Log shed, Shed with a porch, Shed with a lean-to 25
Lean-to Workshop lean-to 12
Workshop Smithy, Workshop barn 40
House Whitewashed house, Long cottage, Thatched cottage, Three-room house 40

How a building goes up

  1. On the plot card, open the "Building" tab, then "What to build", and pick a building.
  2. Click "Choose the place". The card closes and the building's outline follows your cursor over the plot. Z and X turn it, R and F raise or lower it.
  3. Click to set it down. Only now do you pay the labour, and a building site with scaffolding appears on the spot.
  4. Bring wood and stone. You add them at the scaffolding ("Building site: add materials") or on the plot card.
  5. The last materials raise the building. If it is the first building with a lock, the key goes into the owner's bag, even when the owner is not in the game.
  • Anyone can add materials: the owner, a household member or a friend with wood or stone in the bag.
  • Only the owner can put up, move and take down buildings, and on a faction's or noble house's plot so can someone with the "buildings" right.
  • An unfinished building site adds nothing to the upkeep.

Wood and stone

Material Where from
wood the felling ground and the sawmill below Semine
stone the quarry below Trosky
  • The lord adds them to the pay for a load, though not with every load.

Building up and taking down

You pay You get back
building a lean-to up into a workshop 408 gr of labour, wood: 4, stone: 36
"Take the building down" 50% of the labour paid, into your bank
"Abandon the site" nothing
  • The workshop stands on the lean-to's spot. You bring only the rest of the material the lean-to lacks for a workshop.
  • When you take a building down or abandon a site, the materials are lost.

The fence

Part Labour Material
wooden fence, for every 4 m of side 8 gr wood: 1 for every 20 m of side
stone wall, for every 4 m of side 24 gr stone: 5
gate 16 gr wood: 1
  • On the plot card, on the "Fence" tab, you choose the style, the sides and the gates, then "Build the fence". You build it on the spot, with the material in your bag.
  • A fence stands only around a building plot.
  • When you change the style you pay again for every side and gate. Adding a side costs only that side.
  • "Take the fence down" returns 50% of the groschen paid, and the material is lost.

The game server supplies the numbers on this page.